Views: 40 Author: Site Editor Publish Time: 2015-12-10 Origin: Site
The following images show the formwork systems that were used during the construction of a 126m-long twin bridge, which forms part of the upcoming Abu Dhabi-Dubai highway
To construct the bridge, contractor Salini decided to utilise RMD Kwikform elements within its existing fleet, along with a combined equipment strategy devised by the formwork company.
Our expansion joint system will be used for this highway project and we believe this highway will bring easy transportation for Abu Dhabi and Dubai.